If it is necessary to install it on a high platform such as the roof, it is also necessary to consider the wind direction and other factors of the location, and have good lightning protection measures; if it is necessary to install it on the ground, it is also necessary to avoid the air energy heat pump in the strong air outlet position, and it is necessary to avoid the air energy heat pump in the position of the strong air outlet. Make a 200MM installation foundation and thicken a 10~20MM rubber shock-proof pad to ensure use and installation during operation.
There are also some things like the following points that we need and be vigilant:
The operation panel should be installed in a place where it is easy to observe and operate, and should not be installed in a place where it is wet and water.
The control line is pre-buried to the side of the main machine with a threading pipe.
The host should be installed near the power supply and water source to facilitate wiring and pipe layout.
Do not install the host in a contaminated and dusty place.
There should be no strong heat source and other exhaust ports around the host, and no corrosive and combustible gases.
The distance between the outdoor host and the surrounding walls or other placed objects shall not be less than the distance indicated in the figure below.
The main machine box and the hot water tank should be as close as possible, and the distance should not be greater than 5m. The height difference between the main machine and the heating water tank should not be greater than the outside head of the machine.
There should be downspout pipes near the main unit to discharge condensate generated during work.
There should be a separate socket that matches the host’s power near the host.